Here's a number that runs Hollywood and never shows up in a headline: your writer's quote. It's the price you got paid last time, and it quietly decides what you get offered next time. Nobody prints it. Everybody knows it. And once it exists, your reps will fight harder to protect it than they'll fight for almost anything else in your career.
If you're trying to make money writing screenplays, understanding your quote is the difference between building a career and accidentally capping it. Below: what a quote is, the union floor underneath it under the new 2026 WGA agreement, why reps guard it so hard, and the events that actually push it up.
What a writer's quote actually is
Your quote is your established price. It's the compensation you most recently received for comparable work, and it becomes the reference point every future deal negotiates against.
A screenwriter doesn't have one flat rate. Quotes are usually broken out by type of work: a feature rewrite quote, an original screenplay quote, a weekly rate for a TV staff job, an episodic fee. A producer or executive vetting you for a job will ask your reps a simple question: "What's their quote?" What they mean is, "What did the last buyer agree this person was worth?"
In practice a working writer carries a small stack of numbers. A feature writer might have one figure for a rewrite, a bigger one for an original screenplay with treatment, and a record of how those deals were broken into steps. A TV writer's quote is usually a weekly rate at a given title plus a per-episode fee. When someone asks for your quote, they mean whichever number matches the job on the table.
That's the key thing to internalize. A quote isn't your opinion of your value. It's the market's last recorded vote. And the market is lazy: it would rather copy the last vote than run a fresh election.
Why the last deal sets the floor for the next
Buyers anchor. When a studio is deciding what to pay you, their starting assumption is "whatever you got last time, maybe a little more." That's the whole game.

So if you were paid, say, a healthy six figures on your last assignment, your reps walk into the next negotiation and say "their quote is X." The buyer now has to argue you down from X, which is uncomfortable and slow, or accept it and move on. Most of the time, on a deal they want, they move on.
Flip it. If your last deal was tiny, that small number becomes the ceiling everyone reaches up toward. You're now negotiating from the basement, and every buyer who checks around (they talk to each other, quietly, constantly) hears the same low figure.
This is why one deal echoes for years. Quote is sticky. It follows you from project to project, agency memo to agency memo, until something big enough resets it.
And it's not a private number. Business affairs departments compare notes. Producers who worked with you mention what they paid. Agencies keep internal records of every client's last deal. So when a new buyer says "let me check on their quote," they can usually find out fast, and they'll trust that figure more than anything you say about your own worth. The number travels whether you want it to or not, which is exactly why the number you set matters so much.
Quote-protecting: why reps refuse to go low
Here's where new writers get frustrated with their own team. You're broke, an offer comes in below your quote, and your agent says pass. What?
They're quote-protecting. If you take a job at half your established price, you've just told the entire town your new number. The next buyer will ask around, hear the low figure, and anchor there. One cheap deal can undo three good ones.
A good rep treats your quote like a credit score. They'll take a lower fee in specific, defensible situations (a passion project, a prestige director, a format change) and they'll paper it carefully so it reads as an exception, not a reset. What they won't do is quietly let your number slide, because they know they'll spend the next two years clawing it back.
When your agent insists a discount be documented as a one-time favor, they're not being difficult. They're guarding the one number that prices all your future work.
There's a common way to handle this. A writer takes a below-quote fee on a project they love, and the deal paperwork states plainly that the reduced fee is a one-time accommodation and not a reflection of the writer's established price. That one line lets you chase the passion project without torching your market value. If a rep negotiates that language for you, they've done real work, even though nothing about it shows up in your bank account today.
Paper Every Discount
One below-quote deal can become the number every future buyer anchors to, so any cut should be written into the deal as a one-time exception.
The floor under a writer's quote: 2026 WGA minimums
There's a hard bottom under all of this, at least for union-covered work: the WGA minimums, also called scale. The Writers Guild negotiates a Minimum Basic Agreement (MBA) with the studios that sets the lowest a signatory company can pay for covered writing services.
That agreement just turned over. The 2023 MBA ran through May 1, 2026, and its successor, the 2026 Theatrical and Television Basic Agreement, took effect May 2, 2026 and runs through May 1, 2030. The WGA's 2026 Schedule of Minimums sets a rate for each of the agreement's four years, and every rate steps up each May 2.
For the first period, May 2, 2026 through May 1, 2027, the high budget theatrical minimums (films costing $5 million or more) are $173,215 for an original screenplay including treatment; $126,899 for an original screenplay excluding treatment, or the sale of one; $46,152 for a rewrite; and $23,077 for a polish. There's also a new category: a page-one rewrite minimum of $57,500, which applies only when the writer's contract says they're hired for a page-one rewrite.
Low budget minimums, for films under $5 million, are lower: $92,268 for an original screenplay with treatment, $61,990 without, $30,273 for a rewrite and $15,148 for a polish. Television has its own tables, and a staff writer employed week to week earns at least $6,024 a week in the current period.
Two things matter here. First, no signatory can pay you below scale for covered work, so scale is a genuine floor. Second, scale and your quote are not the same thing. A working writer's quote usually sits above minimum; scale is what protects a first-timer or anyone without leverage.
Two more lines in the schedule change the math. Initial compensation, whether at minimum or not, is generally subject to a 10 percent agent commission, so a writer paid exactly scale nets less than scale once their rep is paid. That's one reason reps push for at least a little above minimum even on a first deal. And the employer's pension and health contributions (11.25 percent to the pension plan and 16.25 percent to the health fund for most work) are paid on top of your fee, not carved out of it.
The 2026 Floor
Through May 1, 2027, a signatory can't pay less than $173,215 for a high budget original screenplay including treatment, or $46,152 for a rewrite.
The guaranteed second step: where quote changes the deal shape
One rule in the 2026 schedule shows exactly how quote and scale interact. Under the guaranteed second step, when a company hires a writer for a first draft screenplay, or buys a screenplay from a professional writer, at 225 percent or less of the applicable minimum, it must also employ that writer for a rewrite at no less than the rewrite minimum.
Read that from the writer's side. Near scale, the MBA hands you a second paid step: a chance to fix your own draft before someone else is brought in. Once your quote climbs past 225 percent of minimum, that guarantee falls away, and the buyer is free to thank you after one draft. A higher quote buys more money per step, not more steps. That's why established writers negotiate their steps as hard as their fees, and why a two-step deal at a slightly lower fee can beat a one-step deal at a higher one.
Payment timing follows a similar line. For a writer on a flat deal at twice the applicable minimum or less, the company must pay at least 50 percent of the agreed fee for a step when work starts. If the material isn't delivered within 9 weeks of commencement, another 25 percent is due on invoice, and the final 25 percent comes on delivery. The schedule also says payment can't be contingent on the company approving the material or on securing financing. Above that threshold, those terms are whatever your reps negotiate.
The 225 Percent Line
At 225 percent of minimum or less, a first draft deal carries a guaranteed paid rewrite; above that line, your quote has to buy protections the MBA no longer gives you.
How you break in without a writer's quote
If you've never been paid, you have no quote. That's not a weakness. It's a blank slate, and a blank slate is easier to price high than a low number is to erase.
The move is to establish your first quote as high as the situation honestly supports, then guard it. A few ways writers do that:
Sell or option an original script. When you sell a screenplay or land an option agreement, the numbers on that deal become your first data point. Even a modest sale sets a real, defensible quote. If you want context for what original scripts actually fetch, comparing notes against how much screenplays sell for is the natural benchmark, since a first sale price often becomes a first quote. Options have a floor too: under the MBA, a signatory can option material from a professional writer for up to 18 months for at least 10 percent of minimum, with each renewal of up to 18 months costing another 10 percent.
Win the room off the work. A great spec or pilot gets you meetings. Those meetings turn into your first assignment, and that assignment's fee is your opening quote. This is why the calibre of your sample matters more than your resume when you have no resume: the script that gets read is doing double duty as your price-setter.
ScriptLix
FACETS
On a finished, market ready script, notice how little the page makes you work: clean action lines, a scene engine you can feel from the first beat, and dialogue doing two jobs at once. That level of finish is what lets a rep open a first negotiation above scale instead of apologizing for the draft.
Read free sample →Let a rep quote you into a market, not into a corner. Sometimes an agent will decline a low first job specifically so your debut number lands higher. Painful in the moment. Correct over a career.
So before you send anything out, get an honest read on where the pages stand, because the sample is doing the pricing for you. Score your logline or opening page for free right here.
Free coverage
How would your script score?
Paste a scene or upload your draft. You get a 1 to 100 score, what is working, and the first thing to fix, in about twenty seconds. No account.
Or upload your full draftTreat the result as a diagnostic, not a price tag. A strong read doesn't set your quote; a buyer does. But knowing where the script is soft before a rep takes it out means your first number gets set by your best draft, not your second-best one.
Quotes in television: weekly rates, titles and episodic fees
Television complicates the picture because TV writers are paid two ways at once. There's a weekly salary for time in the room, tied to your title, and there are separate fees when you write an episode. The 2026 schedule notes that since September 25, 2023, staff writers must be paid separately for formats, bibles, stories and teleplays on top of their weekly pay.

Photo by https://kaboompics.com/ on Pexels
So a TV quote is really a pair: a weekly number at your title, and an episodic fee. The title matters as much as the money, because each step up changes the minimum under you. In the current period a staff writer's week-to-week minimum is $6,024, while a writer-producer (co-producer and above) on a guarantee of up to 9 weeks has a minimum of $12,304 a week. Promotions are how TV quotes jump, which is why reps will sometimes take a smaller raise for a bigger title.
Development rooms, rooms of three or more writers convened before a season has a firm commitment, carry their own higher weekly minimums and must guarantee each writer at least 10 consecutive weeks. That pay goes on the record too, and the next business affairs team will see it.
What counts toward your quote, and what doesn't
Not every dollar in a deal moves your number. Buyers generally look at guaranteed fixed compensation: the fees you're paid for the steps you're hired to write. Money that depends on something else happening, like a production bonus when the film gets made, a credit bonus if you end up with screen credit, or backend tied to profits, is typically discussed separately, because it may never be paid at all.
That distinction cuts both ways. A deal with a modest guarantee and a large contingent bonus can look impressive in the trades while doing little for your quote. And a deal that trades some upfront fee for a bigger guarantee, such as an extra committed step, can raise your quote even if the headline total looks smaller. When your reps talk about "the guarantee," this is why.
Residuals are a separate stream again. They're owed under the MBA when work is reused, and the schedule notes they aren't commissionable, but they reflect how the project performed rather than what a buyer agreed to pay you upfront, so they don't define your quote either.
Why a lowball can quietly wreck you
The trap is obvious once you name it: cash now, ceiling forever.
Take a deal well under market and you've booked a job, sure. You've also stamped a low number onto your permanent record. The next buyer anchors to it. Your reps now negotiate uphill on every future deal. And because the town shares quotes informally, you can't hide it. The short-term win becomes a long-term drag that's genuinely hard to reverse, because reversing it means convincing a buyer to pay well above your last recorded price, which is exactly the argument quotes exist to shut down.
That doesn't mean never take less. It means take less on purpose, for a reason worth the cost, and make sure it's papered as an exception.
“A discount you chose is strategy; a discount you drifted into is a wound.”
— Quote Discipline
How quotes actually rise
Quotes don't creep up on their own. They jump on events.
A bidding war. When two buyers want the same script, the price they fight to becomes your new quote, and it can leap past years of incremental raises in a weekend.
A hit. A movie or show that performs, wins awards, or just gets made and seen resets what you're worth. Produced credits move quotes more than almost anything.
Scarcity and heat. When you're the writer everyone's chasing this month, reps convert that demand into a higher number, because the next buyer has to outbid the last.
Bigger scope. Moving from writer to writer-producer, picking up backend points, or negotiating separated rights on original material all raise your total compensation profile and, with it, your quote.
The pattern: quotes rise in steps, triggered by leverage, and each new step becomes the floor for the next negotiation. Same anchoring that traps you at a low number lifts you once the number gets high.
Play the long game
Your quote is a compounding asset. Every deal either raises the floor for your next deal or lowers the ceiling on it. Once you see the game that way, "pass on the lowball" stops sounding like your agent being precious and starts sounding like basic math.

Protect the number. Reset it up on real events. Don't reset it down for rent.
And before you send a sample out to set that first quote, make it undeniable. The strength of that script is what your opening price is built on, and every deal after it builds on the first.

